濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.zzaifang7.cn/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 公司新聞

鋼管怎么搭建木工加工棚?

來源:http://www.zzaifang7.cn/   發(fā)布時(shí)間:2022-03-11

鋼筋加工棚在工地是經(jīng)常要用到的,那么它的搭建也是需要注意的,接下來工地鋼筋加工棚就來為大家介紹一下。

The reinforcement processing shed is often used on the construction site, so its construction also needs attention. Next, the reinforcement processing shed on the construction site will be introduced to you.
鋼筋加工棚采用國際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,后在欄桿上鉤掛標(biāo)語橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。
The reinforcement processing shed is made of international standard steel. Firstly, a number of steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Finally, a safety slogan banner is hung on the railing, and the construction of the whole reinforcement processing shed is completed with standardized design.
鋼筋加工棚是施工現(xiàn)場內(nèi)對鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場地。鋼筋加工棚的長和寬,一般會根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長與寬尺寸。
The reinforcement processing shed is a place for reinforcement processing operations such as straightening, bending and welding on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and other types. The length and width dimensions can be designed according to the actual construction situation.
鋼筋加工棚工作臺的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來,還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The layout of the worktable of the reinforcement processing shed should also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials before processing and finished products after processing, the ground of the reinforcement processing shed should be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there should be cross bars and diagonal braces to ensure the stability of the processing shed.
全拼裝式,快速組裝,拆卸簡單,方便運(yùn)輸,型材及配件規(guī)格可按需求來定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
Fully assembled, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
1、施工現(xiàn)場所有鋼筋加工場均需設(shè)置加工棚,所有露天放置的施工設(shè)備均應(yīng)搭設(shè)防護(hù)棚,如攪拌機(jī)、砂漿機(jī)、輸送泵:在建筑物墜落半徑內(nèi)或塔吊覆蓋范圍內(nèi)的加工棚需 要設(shè)置雙層防護(hù);
1. All reinforcement processing yards on the construction site shall be provided with processing sheds, and all construction equipment placed in the open air shall be provided with safety protection sheds, such as mixers, mortar machines and transfer pumps: the processing sheds within the falling radius of buildings or within the coverage of tower cranes shall be provided with double-layer protection;
2、室外加工棚、防護(hù)棚搭設(shè)要滿足規(guī)范和使用要求,四周懸掛警示標(biāo)語和宣傳標(biāo)語(藍(lán)底白字),地面做硬化處理;
2. The erection of outdoor processing shed and protective shed shall meet the specifications and use requirements. Safety warning slogans and publicity slogans (white words on blue background) shall be hung around, and the ground shall be hardened;
3、加工棚立柱采用方鋼或圓鋼制作,刷建工藍(lán)油漆,防護(hù)棚兩側(cè)應(yīng)設(shè)置八字撐,并滿掛密目網(wǎng),所有水平桿控制伸出立桿外側(cè)100mm;
3. The column of the processing shed shall be made of square steel or round steel and painted with construction blue paint. Eight shaped supports shall be set on both sides of the protective shed, and a dense mesh safety net shall be hung. All horizontal rods shall extend 100mm outside the vertical rod;
4、基礎(chǔ)采C20素砍基礎(chǔ)(地基承載力不能滿足要求時(shí)需配置鋼筋),加工棚立柱與基 礎(chǔ)預(yù)埋件可采用螺栓連接或焊接連接;
4. C20 plain cut foundation shall be adopted for the foundation (reinforcement shall be provided when the bearing capacity of the foundation cannot meet the requirements), and the column of the processing shed and the embedded parts of the foundation can be connected by bolts or welding;
5、屋蓋采用鍍鋅鐵皮瓦,刷建工藍(lán)油漆;
5. The roof adopts galvanized iron sheet tile and is painted with construction blue paint;
6、防護(hù)棚兩頭進(jìn)出口處張掛警示標(biāo)志牌和宣傳標(biāo)語。
6. Safety warning signs and safety propaganda slogans shall be hung at the entrance and exit of both ends of the protective shed.
木工加工棚之工地鋼筋加工棚搭建方案就介紹到這里了。希望對大家有所幫助。在工地鋼筋加工棚搭建的過程中可以關(guān)注一下。不得在施工棚架上架設(shè)施工現(xiàn)場的臨時(shí)電力線。安裝和拆除避難所時(shí),應(yīng)在地面上設(shè)置圍欄和警告標(biāo)志,并指派專人進(jìn)行監(jiān)視。
The construction scheme of woodworking processing shed and site reinforcement processing shed is introduced here. I hope it will help you. You can pay attention to the process of building the reinforcement processing shed on the construction site. Temporary power lines on the construction site shall not be erected on the construction scaffold. When installing and removing shelters, fences and warning signs shall be set on the ground, and special personnel shall be assigned to monitor.